How-to & Guides · How-to

How to Migrate a Workload Between Cloud Providers

Plan, rehearse, cut over, validate, and retire a workload migration while preserving security, data integrity, reliability, and rollback across clouds.

Document class: How-to Guides implementation guide Normative terms: MUST, MUST NOT, SHOULD, SHOULD NOT, and MAY are requirements levels. Applicability: Cross-cloud migration discovery, dependency mapping, data movement, rehearsal, cutover, validation, rollback, and retirement. Exception process: Deviations require a documented risk assessment, compensating controls, named risk owner, and expiry date.

Control fieldValue
Document IDHTG-30
OwnerCloud Center of Excellence
Review cycleAt least annually and after material migration, workload, or provider changes
EvidenceDependency inventory, migration plan, rehearsal results, data checksums, cutover decision, business validation, rollback window, and retirement evidence

Decision in brief: Migrate a verified service capability with rehearsed data and rollback, and keep the old path available until business validation completes.

Document type: Migration implementation guide Operating principle: Migrate a verified service capability, not merely compute and data, and keep rollback viable until business validation is complete.

Objective

Move or re-platform a workload between Azure, AWS, GCP, or OCI with controlled impact. The migration includes identity, network, DNS, certificates, data, application artifacts, observability, backup, operations, compliance, cost, and decommissioning.

Select the migration strategy

Choose retain, retire, relocate, rehost, replatform, refactor, or replace for each component. Base the decision on business outcome, data gravity, provider coupling, licensing, latency, compliance, support, engineering capacity, and exit cost. A multi-cloud requirement does not imply that every component must run in every cloud.

Migration flow

flowchart LR DISCOVER[Discover dependencies] --> DESIGN[Target architecture] DESIGN --> FOUNDATION[Build governed foundation] FOUNDATION --> REHEARSE[Rehearse data and application move] REHEARSE --> SYNC[Synchronize changes] SYNC --> CUTOVER[Controlled cutover] CUTOVER --> VALIDATE[Technical and business validation] VALIDATE -->|Pass| RETIRE[Retire source safely] VALIDATE -->|Fail| ROLLBACK[Rollback and reconcile]

Discover the real dependency graph

Inventory inbound and outbound traffic, identity providers, service identities, DNS, certificates, databases, queues, object stores, file shares, batch jobs, integrations, observability, backups, deployment systems, licensing, support, data residency, and peak demand. Observe runtime traffic and logs; interviews and CMDB records alone miss dependencies.

Build the target foundation

Create organization hierarchy, accounts, identity federation, network transit, DNS, security controls, policy, logging, backup, key management, quotas, and cost allocation before deploying the workload. Use approved modules and import existing resources only when ownership and state are clear.

Plan data movement

Define source of truth, initial copy, change capture, ordering, schema conversion, encryption, bandwidth, checksums, reconciliation, freeze window, RPO, and rollback. Test full-scale transfer duration and throttling. Replication is not proof of semantic correctness; validate record counts, balances, referential integrity, and application behavior.

Rehearse

Perform at least one production-like rehearsal with anonymized or protected data. Measure every step, dependency, manual decision, and rollback time. Run performance, security, failure, backup, restore, and operational-readiness tests in the target cloud. Update the runbook from observed results.

Cut over

  1. Confirm change approval, owners, support, communication, and rollback thresholds.
  2. Freeze incompatible changes and verify source and target health.
  3. Complete final synchronization and integrity checks.
  4. Record the exact point after which writes cannot safely return to the source.
  5. Shift a small traffic cohort through weighted routing where feasible.
  6. Monitor journey SLIs, errors, latency, saturation, security signals, and replication lag.
  7. Increase traffic only after the observation gate passes.
  8. Obtain business validation before declaring completion.

Rollback and reconciliation

Rollback criteria must be numerical and time-bound. Define DNS/traffic reversal, data-write ownership, queued-event handling, schema compatibility, and reconciliation for writes accepted during cutover. If data divergence makes rollback unsafe, execute a forward-recovery plan instead of improvising bidirectional writes.

Decommission safely

After the agreed stabilization period, remove routes and trust, revoke source credentials, preserve required logs and backups, export final evidence, release licenses and commitments, delete data under approved retention, update the catalog and diagrams, and close provider support dependencies. Continue cost monitoring until residual spend reaches the expected baseline.

Validation

  • The dependency inventory is confirmed by runtime telemetry and owners.
  • The target meets security, resilience, performance, backup, compliance, and cost requirements.
  • Full-scale data transfer and reconciliation meet RPO and cutover duration.
  • Rollback or forward recovery is rehearsed and has clear decision authority.
  • Business journeys, not only infrastructure health, pass after cutover.
  • Source retirement preserves evidence and removes access, data, and residual cost.

Operational boundaries and acceptance criteria

Before adopting this guidance, record the accountable service owner, supported environments, critical dependencies, data classification, and the operational tier. State which decisions belong to the platform team and which remain with the workload team; document any exception with a risk owner and expiry date. This prevents a reference pattern from being treated as a universal fit.

Define observable acceptance checks before rollout. Include a positive path, a denied or invalid request, a dependency failure, and recovery after the failure clears. Capture the configuration or command output that proves each check, along with the software and policy versions used. Make checks repeatable in a representative non-production environment, and ensure they fail closed when required evidence is missing.

For production changes, identify the safe rollback or forward-recovery action, the person authorized to invoke it, and the condition that triggers it. Confirm that monitoring, support ownership, capacity limits, and escalation contacts are in place before declaring the change complete. Review these assumptions after a material platform, provider, or regulatory change.

Decision records and service boundaries

For each major design choice, record the requirement that drove it, the alternatives considered, the expected failure domain, and the conditions that would trigger a revisit. Keep the logical capability separate from provider-specific implementation so a service substitution does not silently change the security or recovery contract. Identify shared platform dependencies and set explicit limits for tenant isolation, capacity, and administrative access.

Validate the architecture against at least one degraded scenario, one regional or site recovery scenario, and one ownership hand-off. Trace a critical user transaction through identity, network, data, and telemetry boundaries; gaps in the trace often reveal an unowned dependency. Assign each interface an operational owner, support target, and evidence source. Review decision records when scale, regulation, threat model, or provider capability changes materially.