Cloud Foundations & Governance · Architecture

Shared Platform Services Architecture

Defines the selection, isolation, consumption, ownership, reliability, and lifecycle standards for shared services in a multi-cloud platform.

Document class: Cloud Foundations & Governance architecture reference model Normative terms: MUST, MUST NOT, SHOULD, SHOULD NOT, and MAY are requirements levels. Applicability: Shared platform service selection, isolation, consumption, ownership, reliability, cost, change management, and retirement. Exception process: Deviations require a documented risk assessment, compensating controls, named risk owner, and expiry date.

Control fieldValue
Document IDCFG-13
OwnerCloud Center of Excellence
Review cycleAt least annually and after material platform, provider, data, security, or operating-model changes
EvidenceService catalog and contracts, SLOs, dependency maps, onboarding and exit tests, and concentration reports

Decision in brief: Promote a capability to shared service only when its interface, isolation, ownership, reliability, cost, and exit path are explicit.

Purpose

This standard defines when a capability should become a shared platform service and how it must be isolated, consumed, operated, and retired. Shared services reduce duplication only when their ownership, interfaces, failure domains, security boundaries, and costs are explicit.

Candidate service domains

  • identity federation and privileged access;
  • transit networking, DNS, ingress, egress, and private connectivity;
  • audit logging, metrics, security telemetry, and incident integration;
  • key, secret, certificate, and trust services;
  • artifact and container registries;
  • deployment runners, policy evaluation, and automation services;
  • time synchronization, configuration, directory, and license services;
  • backup catalogs, recovery orchestration, and security tooling.

An application-specific database, message broker, or API is not automatically a platform service merely because several teams use it.

Qualification test

A shared service should have at least one stable reusable contract and a named product owner. Evaluate:

QuestionCentralize whenKeep workload-owned when
Control consistencyA mandatory baseline must be uniformRequirements materially differ
ExpertiseScarce expertise benefits many teamsProduct expertise belongs with one team
Failure impactRegional cells can contain failureCentralization creates unacceptable blast radius
EconomicsShared scale reduces total costChargeback and idle capacity outweigh savings
Change cadenceConsumers can use a stable contractConsumers need independent rapid change
Data boundaryShared handling is legally permittedIsolation or sovereignty requires separation

Reference architecture

flowchart TB CAT[Platform service catalog and API contracts] CAT --> ID[Identity cell] CAT --> NET[Connectivity and DNS cell] CAT --> SEC[Security and telemetry cell] CAT --> DEV[Developer enablement cell] ID & NET & SEC & DEV --> PROD[Production landing zones] ID & NET & SEC & DEV --> NPROD[Non-production landing zones] ID & NET & SEC & DEV --> DATA[Data and AI landing zones] OBS[Independent health, SLO, and cost telemetry] --> ID OBS --> NET OBS --> SEC OBS --> DEV

Prefer regional or regulatory cells over one global deployment when isolation and recovery objectives require them.

Organizational placement

ProviderTypical shared-service boundaryWorkload consumption pattern
AzureDedicated platform subscriptionsPeering/Virtual WAN, private endpoints, RBAC, service APIs
AWSDedicated infrastructure, network, security, and tooling accountsTransit attachments, RAM, PrivateLink, cross-account roles
GCPHost and service projects in platform foldersShared VPC, Private Service Connect, IAM, service APIs
OCINetwork, security, and shared-service compartments or tenanciesDRG, service gateways, private endpoints, IAM policies

Administrative ownership must be separated from consumer permissions. Workload teams receive the ability to consume a service contract, not broad administration of the service plane.

Service contract

Every shared service must publish:

  • intended consumers and supported use cases;
  • request interface and required metadata;
  • authentication and authorization model;
  • data classification and residency limits;
  • quotas, limits, fair-use policy, and scaling behavior;
  • availability, latency, support, recovery, and maintenance objectives;
  • versioning, compatibility, deprecation, and migration policy;
  • cost allocation method and consumer-visible measures;
  • escalation path, owner, and security contact.
service: private-dns-resolution
version: 2.1
scope: regional-cell
consumer_input:
  - landing_zone_id
  - network_id
  - approved_namespaces
slo:
  availability: 99.95%
  recovery_time: 60m
change_policy: backward-compatible-by-default
owner: network-platform

Reliability and blast radius

Do not advertise a service objective higher than its dependencies can support. Model identity, DNS, network, key management, artifact registry, and automation dependencies explicitly. Eliminate circular dependencies; for example, recovery access must not depend exclusively on the failing identity or DNS service.

Use cells when a failure, compromise, quota exhaustion, or unsafe change should not affect all clouds or environments. Define degraded modes, cached behavior, and consumer-side timeouts. Test regional isolation and restoration from source-controlled configuration.

Security model

  • Use consumer-specific identities and least-privilege endpoints.
  • Separate service administration, security administration, and consumption.
  • Keep management endpoints private or strongly access controlled.
  • Log control-plane changes and consumer requests centrally.
  • Apply tenant or consumer isolation to data, quotas, and encryption where required.
  • Scan shared artifacts and sign released versions.
  • Threat-model the service and its onboarding automation.

Lifecycle and change management

stateDiagram-v2 [*] --> Proposed Proposed --> Pilot Pilot --> Supported Supported --> Deprecated Deprecated --> Retired Pilot --> Rejected Supported --> Pilot: major replacement

Breaking changes require a new contract version, migration path, consumer inventory, communicated deadline, and rollback. A service cannot be retired until dependency discovery confirms that consumers migrated or accepted the risk.

Implementation sequence

  1. Inventory repeated capabilities and existing shared dependencies.
  2. Apply the qualification test and identify accountable product owners.
  3. Define service contract, threat model, SLO, cost model, and failure domains.
  4. Deploy isolated provider boundaries and regional cells through IaC.
  5. Build self-service onboarding, policy checks, and consumer documentation.
  6. Pilot with representative production and non-production consumers.
  7. Measure reliability, adoption, satisfaction, cost, and support load.
  8. Formalize versioning, recovery, deprecation, and retirement practices.

Validation

Before general availability, verify:

  • consumer access cannot administer other consumers or the service plane;
  • regional or cell failure stays within the declared blast radius;
  • service restoration meets recovery objectives;
  • quotas and noisy-neighbor controls work under load;
  • audit, cost, and ownership metadata are complete;
  • contract tests detect incompatible provider or service changes;
  • onboarding and offboarding leave no unmanaged trust or routes;
  • dependency and consumer inventories are current.

Operational considerations

Operate each shared capability as a product with a backlog, roadmap, SLOs, on-call ownership, security review, capacity plan, and unit-cost measures. Adoption count alone is insufficient; also track reliability, time to onboard, change failure rate, support burden, consumer satisfaction, unused allocation, and concentration risk.

Consumer isolation models

A shared service must state its isolation unit:

Isolation modelExampleRisk control
Logical tenantShared API with tenant identifierAuthorization and data partitioning
Dedicated namespace or projectShared control plane, separate execution scopeQuotas, identity, and policy
Dedicated regional cellSeparate service instance per region or profileFailure and sovereignty containment
Dedicated consumer instanceOne deployment per workloadStronger isolation with higher cost
Separate tenancy or accountIndependent administrative boundaryHighest conventional isolation

Select isolation from the threat model, data, noisy-neighbor risk, recovery, and cost. Do not advertise “multi-tenant” without defining how data, identity, quotas, logs, and encryption are separated.

Dependency management

Publish a dependency map containing:

  • upstream identity, DNS, network, key, registry, data, and provider services;
  • consumer dependencies and criticality;
  • startup and runtime behavior when dependencies fail;
  • timeout, retry, cache, and degradation rules;
  • recovery order;
  • circular-dependency analysis.

For Tier 0 and Tier 1 services, test recovery with one major dependency unavailable. A service that can be rebuilt only through itself is not recoverable.

Onboarding and contract testing

Consumer onboarding should verify:

  1. Identity and authorization.
  2. Network and DNS path.
  3. Quota and cost allocation.
  4. Data classification and regional eligibility.
  5. Supported client or protocol version.
  6. Telemetry and audit correlation.
  7. Failure and retry behavior.
  8. Offboarding and credential revocation.

Provide automated contract tests that consumers can run before production. Contract tests should identify incompatible changes earlier than an incident.

Concentration and exit risk

For each shared service, quantify:

  • number and criticality of consumers;
  • regional and provider concentration;
  • substitute or degraded-mode capability;
  • recovery and migration duration;
  • proprietary data or protocol lock-in;
  • contract and licensing dependency;
  • retirement cost.

A service may reduce duplication while increasing systemic risk. High concentration requires stronger cells, recovery, change control, and capacity governance.

References